Counterweight with a spray of paint, other parts of the original paint, normal performance, bucket 2.1 cubic meters. cm, used in municipal construction
Counterweight with a spray of paint, other parts of the original paint, normal performance, bucket 2.1 cubic meters. cm, used in municipal construction
It was manufactured in 2018, the production of 6200 hours, the counterweight is painted, the remaining parts are in the original state, the performance is normal, a bucket with a volume of 1.7 cubic meters was used in an open coal context.
The air filter filters the dust contained in the absorbed air using internal and external filter elements, providing the purity of air entering the combustion chamber of the engine.
It was manufactured in 2022, the production of 800 hours, original paint, normal performance, a bucket volume of 1.8 cubic meters, was used on the gas pipeline project.