Year of manufacture: 2022. The operating time is 2,600 hours, painting the counterweight. The technical condition is regular. The volume of the bucket (scoop) is 1.5 cubic meters. For the construction of an oil pipeline.
Year of manufacture: 2022. The operating time is 2,600 hours, painting the counterweight. The technical condition is regular. The volume of the bucket (scoop) is 1.5 cubic meters. For the construction of an oil pipeline.
Year of manufacture: 2021. The operating time is 2,700 hours, painting the counterweight. The technical condition is regular. The volume of the bucket (scoop) is 1.5 cubic meters. For the construction of an oil pipeline.
Restored, without records of use in the country, is completely repainted, all characteristics comply with the standards of the new car. Engine, hydraulic pump, control valve, rotary device, chassis, cylinders, structural elements - everything is restored. Bucket volume is 1.2 cubic meters.
It was manufactured in 2018, the production of 6200 hours, the counterweight is painted, the remaining parts are in the original state, the performance is normal, a bucket with a volume of 1.7 cubic meters was used in an open coal context.
Reconstruction : original paint, all characteristics comply with the standards of new equipment. The engine, a hydraulic pump, control valve, rotary mechanism, chassis, cylinders and structural elements are restored. The volume of the bucket is 1.4 cubic meters.
It was manufactured in 2019, the production of 5000 hours, the counterweight is painted, the remaining parts in the original paint, the performance is normal, the bucket of 1.9 cubic meters was used for municipal construction.
Restored, there are no records of use at home, all characteristics correspond to the standards of new cars, an engine, a hydraulic pump, a control valve, a rotary device, a running device, a cylinder, structural parts are restored, the details of the chassis are completely new. The capacity of the bucket is 2.8 cubic meters.
It was manufactured in 2022, the production of 2200 hours, the original paint, the working condition is normal, the volume of the bucket is 5.0 cubic meters, used in the coal mine.