It was manufactured in 2022, the production of 2200 hours, the original paint, the working condition is normal, the volume of the bucket is 5.0 cubic meters, used in the coal mine.
It was manufactured in 2022, the production of 2200 hours, the original paint, the working condition is normal, the volume of the bucket is 5.0 cubic meters, used in the coal mine.
The whole part is heated using a medium -frequency hardening machine, cooled by spraying and fully checked to ensure the hardness of the surface and good shock viscosity, reduce wear of the rail circuit and extend the service life.
It was manufactured in 2019, the production of 5000 hours, the counterweight is painted, the remaining parts in the original paint, the performance is normal, the bucket of 1.9 cubic meters was used for municipal construction.
The engine is converted : engine, a hydraulic pump, control valve, all machine wiring, computer board, all the pipelines of the machine, chassis and other nodes are replaced by new original spare parts.
Reconstruction : original paint, all characteristics comply with the standards of new equipment. The engine, a hydraulic pump, control valve, rotary mechanism, chassis, cylinders and structural elements are restored. The volume of the bucket is 1.4 cubic meters.
Year of manufacture: 2023. Employment 230 hours. Native paint. The technical condition is regular. The volume of the bucket (scoop) is 3.0 cubic meters. For the construction of roads.
Year of manufacture: 2021. The operating time is 2,700 hours, painting the counterweight. The technical condition is regular. The volume of the bucket (scoop) is 1.5 cubic meters. For the construction of an oil pipeline.